Baden Borough is in the planning stages of an effort to build a fishing pier along the Ohio River. Below are preliminary illustrations of the pier. Check back regularly for updates!


Project Phases:
- Build retaining wall on the east elevation. Backfill slope with rip rad, trim trees
- Improve road way shoulder for parking. Signage and area descending and ascending fishing area, place two surveillance cameras.
- Ramp/walkway and floating 30′ dock. With area for ADA, kayak to put in. Trash barrels and port-a-john.
Review Survey:
- Get permission from Westview for use of the land (99-year lease and electrical hookup for camera)
- Change permit to reflect fishing and kayak usage
- Secure any necessary Army Corps of Engineers permits
- Beaver County Conservation consultation for excavation of the east slope for erosion control
- Check with fish and boat commission
- ADA response
- Insurance tort and liability
- Secure vendors for surveillance, tree service, and CBS concrete
Estimated cost: $200,000
Estimated completion: Summer 2028